HOUSE
CONSTRUCTION PROCESS
Let's learn about the house construction process
Building a house is a first-time experience for many people. By mastering the complete process and understanding the necessary procedures, and watching the house take shape bit by bit before our eyes, we will gain clarity on what the home of our dreams truly looks like.
the house construction process

01

02

03
Client Consultation
Commissioning Design
Preliminary Design
.png)
04
.png)
05
.png)
06
Signing a Contract
Detailed Design
Drawing Issuance and Approval
.png)
07
.png)
08
.png)
09
Production
Quality Inspection - Pre-installation - Quality Inspection
Transport
.png)
10
.png)
11
.png)
12
Assembly
Delivery
Post-sales Support

01
Preliminary Design
Exploration of the Ideal Home
First, confirm the desired living environment with your family to have a general direction, then discuss the details with the designer based on the reference images.

Commissioning Design
Provide reference drawings and pictures
The client provides the existing architectural drawings or reference drawings to the designer, and the designer designs and optimizes the drawings.
02

03
Client Consultation
The designer designs and optimizes the drawings
The designer designs and optimizes the drawings based on the materials provided by the client, so as to meet the client's conception and planning for the house.
.png)
Signing a Contract
Sign a contract with the client
After the client is satisfied with the design drawings, a cooperation intention is reached, and a design and construction contract is signed with us.
04
.png)
05
Client Consultation
he designer refines the drawings
The designer modifies and refines the drawings based on the actual site conditions, while taking into account the geological conditions, construction environment, and local regulations.
.png)
Drawing Issuance and Approval
The drawings are completed and submitted for approval
After the detailed development of the drawings is completed, they will be submitted to the relevant local authorities for approval.
06
.png)
07
Production
The drawings are submitted to the factory for production.
After the approval of the drawings is completed, the drawings will be submitted to the factory, and the factory will fully devote itself to producing the components required for the building.
.png)
Quality Inspection - Pre-installation - Quality Inspection
Factory Pre-installation
After the component production is completed, pre-installation will be carried out in the factory to check for potential issues.
08
.png)
09
Transport
Transport the products safely to the project site
After the pre-installation is completed, the products will be packaged and transported safely to the project destination.
.png)
Assembly
Start building your home
After transporting the products to the destination, hoist and install them in a timely manner to start building your first house.
10
.png)
11
Delivery
The house has been completed.
After the house is completed, we will conduct a final comprehensive inspection of the house's structure, mechanical and electrical systems, decoration, and other aspects.
.png)
Post-sales Support
The guarantee for a secure and peaceful life
To ensure customers can live a comfortable and secure life, we provide comprehensive after-sales maintenance services.
12
.png)